| Document Name | Applicable Year | Revision Date | Model Type | Category | |
|---|---|---|---|---|---|
| Secondary CO2 Flow Setting Guide | 2024, 2025 | 05/31/2024 | CO2 | IOM |
|
| Secondary CO2 FY24 460V Parameter List | 2024 | 10/17/2024 | CO2 | IOM |
|
| Secondary CO2 FY24 208V Parameter List | 2024 | 10/17/2024 | CO2 | IOM |
|
| Secondary CO2 FY24 Sequence of Operations | 2024 | 10/01/2024 | CO2 | IOM |
|
| Secondary CO2 FY24 Controller User Guide | 2024 | 05/31/2024 | CO2 | IOM |
|
| Secondary CO2 FY24 Lifting and Rigging Document | 2024 | 05/31/2024 | CO2 | IOM |
|
| Secondary CO2 FY24 208V Submittal | 2024 | 02/28/2025 | CO2 | Submittal |
|
| Secondary CO2 FY24 460V Submittal | 2024 | 02/28/2025 | CO2 | Submittal |
|
| Generac PWRcell 1 Battery Backup Re-Enable | 2024, 2026, 2025 | 06/06/2024 | PWRcell 1, CO2 | IOM |
|
| Generac PWRcell 1 Installation and Commissioning Guideline | 2024, 2026, 2025 | 11/22/2024 | PWRcell 1, CO2 | IOM |
|
| Generac PWRcell 1 Inverter/Battery Layout Drawing | 2024, 2026, 2025 | 06/24/2024 | PWRcell 1, CO2 | IOM |
|
| Secondary CO2 FY24 IOM | 2024 | 07/15/2024 | CO2 | IOM |
|
| Secondary CO2 FY24 Spare Parts List | 2024 | 11/26/2024 | CO2 | IOM |
|
| Secondary CO2 FY24 Capacity Charts | 2024 | 11/14/2024 | CO2 | Submittal |
|
| Secondary CO2 FY24 Training PowerPoint | 2024 | 05/31/2024 | CO2 | Training |
|
| Secondary CO2 Base Mounting Details | 2024, 2025 | 05/31/2024 | CO2 | IOM |
|
| Secondary CO2 AES Curb Drawings | 2024, 2025 | 05/31/2024 | CO2 | IOM |
|
| Walmart Glycol Test, Flush, and Fill Procedure | 2024, 2025 | 05/31/2024 | HRU, Glycol | IOM |
|
| Secondary Glycol FY24 Flow Setting Guideline | 2024 | 05/31/2024 | Glycol | IOM |
|
| Secondary Glycol FY24 Sequence of Operation | 2024 | 10/01/2024 | Glycol | IOM |
|
| Secondary Glycol FY24 32-160 460V Parameter List | 2024 | 10/17/2024 | Glycol | IOM |
|
| Secondary Glycol FY24 32-160 208V Parameter List | 2024 | 10/17/2024 | Glycol | IOM |
|
| Secondary Glycol FY24 20-95 460V Parameter List | 2024 | 10/17/2024 | Glycol | IOM |
|
| Secondary Glycol FY24 Controller User Guide | 2024 | 05/31/2024 | Glycol | IOM |
|
| Secondary Glycol FY24 Lifting and Rigging Document | 2024 | 05/31/2024 | Glycol | IOM |
|
| Secondary Glycol FY24 20-95 208V Submittal | 2024 | 02/28/2025 | Glycol | Submittal |
|
| Secondary Glycol FY24 20-95 460V Submittal | 2024 | 02/19/2025 | Glycol | Submittal |
|
| Secondary Glycol FY24 32-160 208V Submittal | 2024 | 02/19/2025 | Glycol | Submittal |
|
| Secondary Glycol FY24 32-160 460V Submittal | 2024 | 02/19/2025 | Glycol | Submittal |
|
| Secondary Glycol FY24 IOM | 2024 | 02/17/2025 | Glycol | IOM |
|
| Secondary Glycol FY24 Spare Parts List | 2024 | 06/25/2024 | Glycol | IOM |
|
| Secondary Glycol FY24 Capacity Charts | 2024 | 11/14/2024 | Glycol | Submittal |
|
| Secondary Glycol FY24 Training Powerpoint | 2024 | 11/14/2024 | Glycol | Training |
|
| Secondary Glycol Base Mounting Details | 2024, 2025 | 05/31/2024 | Glycol | IOM |
|
| Secondary Glycol AES Curb Drawing | 2024, 2025 | 05/31/2024 | Glycol | IOM |
|
| Boss Submittal | 2024, 2025 | 02/17/2025 | Boss | Submittal |
|
| Secondary CO2 Startup and Commissioning Check Sheet | 2024, 2026, 2025 | 03/03/2026 | CO2 | IOM |
|
| Secondary Skid Commissioning Request Form | 2024, 2025 | 01/06/2025 | CO2, Glycol | IOM |
|
| Secondary Glycol Startup and Commissioning Check Sheet | 2024, 2026, 2025 | 03/03/2026 | Glycol | IOM |
|
| Secondary CO2 Capacity Chart | 2025, 2026 | 03/04/2026 | CO2 | Submittal |
|
| Secondary Glycol Capacity Chart | 2025, 2026 | 03/04/2026 | Glycol | Submittal |
|
| Generac PWRcell 1 Battery Cabinet Owner's Manual | 2026, 2024, 2025 | 11/15/2024 | PWRcell 1 | IOM |
|
| Generac PWRcell 1 Inverter Owner's Manual | 2026, 2024, 2025 | 11/15/2024 | PWRcell 1 | IOM |
|
| Secondary CO2 FY24 Pump Skid Controls SOO | 2024 | 11/15/2024 | CO2 | IOM |
|
| Secondary CO2 FY24 Chiller User Guide | 2024 | 11/15/2024 | CO2 | IOM |
|
| Store 4615 Submittal | Archive | 11/15/2024 | CO2 | Submittal |
|
| Store 1555 Submittal | Archive | 11/15/2024 | Glycol | Submittal |
|
| Store 1859 Submittal | Archive | 11/15/2024 | Glycol | Submittal |
|
| Store 3248 Submittal | Archive | 11/15/2024 | Glycol | Submittal |
|
| Store 3516 Submittal | Archive | 11/15/2024 | Glycol | Submittal |
|
| Secondary Glycol FY24 Pump Skid Controls SOO | 2024 | 11/15/2024 | Glycol | IOM |
|
| Glycol Submittal | Archive | 11/15/2024 | Glycol | Submittal |
|
| Store 374 IOM | Archive | 11/15/2024 | SCWC | IOM |
|
| Store 374 Submittal | Archive | 11/15/2024 | SCWC | Submittal |
|
| Store 472 Submittal | Archive | 11/15/2024 | Glycol | Submittal |
|
| Store 5149 Submittal | Archive | 11/15/2024 | Glycol | Submittal |
|
| Store 1068 Submittal | Archive | 11/15/2024 | Glycol | Submittal |
|
| Store 4446 Submittal | Archive | 11/15/2024 | Glycol | Submittal |
|
| Store 5365 Submittal Medium | Archive | 11/15/2024 | Glycol | Submittal |
|
| Store 5365 Submittal Mini | Archive | 11/15/2024 | Glycol | Submittal |
|
| Store 5392 Submittal Medium | Archive | 11/15/2024 | Glycol | Submittal |
|
| Store 5392 Submittal Mini | Archive | 11/15/2024 | Glycol | Submittal |
|
| Chiller User Guide | Archive | 11/15/2024 | LPA | IOM |
|
| Submittal Detail | Archive | 11/15/2024 | Glycol | Submittal |
|
| RAE Connect Panel Mounting Instructions | Archive | 11/15/2024 | HRU, LPA | IOM |
|
| HRU Sequence of Operations | Archive | 11/15/2024 | HRU | IOM |
|
| HRU Submittal Drawings | Archive | 03/13/2026 | HRU | Submittal |
|
| 2021 HRU IOM | Archive | 03/13/2026 | HRU | IOM |
|
| PPD-75 Electrical Drawings 2020 | Archive | 03/13/2026 | HRU | Submittal |
|
| PPD-75, PPD-75E IOM 2019 | Archive | 03/13/2026 | HRU | Submittal |
|
| PPD-75, PPD-75E Unit and Piping Drawings | Archive | 11/15/2024 | HRU | Submittal |
|
| PPD-75, PPD-75E Electrical Drawings | Archive | 03/13/2026 | HRU | Submittal |
|
| PPS/PPS-37.5, PPS-37.5E, PPS-37.5L, PPS-37.5LE IOM 2019 | Archive | 03/13/2026 | HRU | IOM |
|
| PPS/PPS-37.5,PPS-37.5E,PPS-37.5L,PPS-37.5LE Unit and Piping Drawings | Archive | 11/15/2024 | HRU | Submittal |
|
| PPS/PPS-37.5,PPS-37.5E,PPS-37.5L,PPS-37.5LE Electrical Drawings | Archive | 03/13/2026 | HRU | Submittal |
|
| LPA Submittal Drawings | Archive | 11/15/2024 | LPA | Submittal |
|
| LPA Sequence Of Operations | Archive | 11/15/2024 | LPA | IOM |
|
| LT-LPA IOM 2022 | Archive | 01/01/2022 | LPA | IOM |
|
| LT-LPA-001 Unit, Piping, Electrical Drawings | Archive | 01/01/2020 | LPA | Submittal |
|
| LT-LPA-002 Unit, Piping, Electrical Drawings | Archive | 01/01/2020 | LPA | Submittal |
|
| LT-LPA-003 Unit, Piping, Electrical Drawings | Archive | 01/01/2020 | LPA | Submittal |
|
| LT-LPA IOM 2020 | Archive | 01/01/2020 | LPA | IOM |
|
| LPA IOM 2019 | Archive | 01/01/2019 | LPA | IOM |
|
| Coil Box Submittal Drawings | Archive | 01/28/2021 | HRU | Submittal |
|
| C-6000 Mounting Instructions | Archive | 11/15/2024 | HRU | IOM |
|
| B-BOX Mounting Instructions | Archive | 11/15/2024 | HRU | IOM |
|
| C-8000 Mounting Instructions | Archive | 11/15/2024 | HRU | IOM |
|
| LPA/HRU Commissioning Guideline 2021 | Archive | 01/01/2021 | HRU | IOM |
|
| LPA/HRU Commissioning Guideline 2019 | Archive | 01/01/2019 | HRU | IOM |
|
| RO Project BAS Set Points 2019 | Archive | 01/01/2019 | IOM |
|
|
| LPA Annual PM Checklist | Archive | 01/01/2019 | LPA | IOM |
|
| HR Annual PM Checklist | Archive | 01/01/2019 | HRU | IOM |
|
| Secondary Glycol Expansion Tank Guide | 2024, 2025, 2026 | 11/14/2025 | Glycol | IOM |
|
| Secondary Glycol 32-160 25.1 Submittal | 2025 | 04/17/2026 | Glycol | Submittal |
|
| Secondary Glycol 20-95 25.1 Submittal | 2025 | 04/17/2026 | Glycol | Submittal |
|
| Secondary CO2 1-10 25.1 Submittal | 2025 | 10/03/2025 | CO2 | Submittal |
|
| Secondary Skid Startup Request Form | 2024, 2025 | 01/06/2025 | CO2, Glycol | IOM |
|
| Heat Reclaim 25.1 Submittal | 2025 | 04/17/2026 | HRU | Submittal |
|
| Secondary Glycol 25.1 IOM | 2025 | 08/19/2025 | Glycol | IOM |
|
| Secondary CO2 25.1 Spare Parts List | 2025 | 02/17/2025 | CO2 | IOM |
|
| Secondary Glycol 25.1 32-160 Spare Parts List | 2025 | 08/19/2025 | Glycol | IOM |
|
| Secondary Glycol 25.1 20-95 Spare Parts List | 2025 | 08/19/2025 | Glycol | IOM |
|
| Secondary CO2 Startup Guide | 2024, 2025 | 02/17/2025 | CO2 | IOM |
|
| Secondary CO2 25.1 IOM | 2025 | 02/17/2025 | CO2 | IOM |
|
| C-8000 25.1 Coil Box Submittal | 2025 | 02/18/2025 | HRU | Submittal |
|
| CAPAIR 25.1 Coil Box Submittal | 2025 | 02/18/2025 | HRU | Submittal |
|
| C-6000 25.1 Coil Box Submittal | 2025 | 02/18/2025 | HRU | Submittal |
|
| Heat Reclaim 25.1 (L/R) Ground-Mount Base Support Details | 2025 | 03/31/2025 | HRU | IOM |
|
| Heat Reclaim Roof-Mounted Base Mounting Details | 2025 | 03/31/2025 | HRU | IOM |
|
| Heat Reclaim 25.1 IOM | 2025 | 04/17/2025 | HRU | IOM |
|
| Secondary Glycol 25.1 Flow Setting Guideline | 2025 | 05/07/2025 | Glycol | IOM |
|
| Secondary CO2 FY25 Pump Skid Controls SOO | 2025 | 06/13/2025 | CO2 | IOM |
|
| Secondary Glycol FY25 Pump Skid Controls SOO | 2025 | 06/13/2025 | Glycol | IOM |
|
| Secondary Glycol Troubleshooting Guide | 2024, 2025, 2026 | 08/19/2025 | Glycol | IOM |
|
| Secondary CO2 Troubleshooting Guide | 2024, 2025, 2026 | 03/05/2026 | CO2 | IOM |
|
| Generac PWRcell 2 Inverter Spec Sheet | 2026 | 08/19/2025 | PWRcell 2 | Cutsheet |
|
| Generac PWRcell 2 Smart Disconnect Switch Spec Sheet | 2026 | 08/19/2025 | PWRcell 2 | Cutsheet |
|
| Generac PWRcell 2 DCB Battery Module Spec Sheet | 2026 | 08/19/2025 | PWRcell 2 | Cutsheet |
|
| Generac PWRcell 2 Inverter Installation Manual | 2026 | 08/19/2025 | PWRcell 2 | IOM |
|
| Generac PWRcell 2 Battery Installation Manual | 2026 | 08/19/2025 | PWRcell 2 | IOM |
|
| Generac PWRcell 2 Battery Cabinet Spec Sheet | 2026 | 08/19/2025 | PWRcell 2 | Cutsheet |
|
| Generac PWRcell 2 Smart Disconnect Switch Installation Manual | 2026 | 08/19/2025 | PWRcell 2 | IOM |
|
| HRU FY25 Sequence of Operations | 2025 | 08/19/2025 | HRU | IOM |
|
| Generac PWRcell 2 26 Submittal | 2026 | 08/29/2025 | PWRcell 2 | Submittal |
|
| Generac PWRcell 1 Diagnostic Repair Manual | 2025, 2026, 2024 | 08/29/2025 | PWRcell 1 | IOM |
|
| Secondary Glycol 32-160 26 Submittal | 2026 | 03/03/2026 | Glycol | Submittal |
|
| Generac PWRcell 1 Parts Manual | 2025, 2026, 2024 | 08/29/2025 | PWRcell 1 | IOM |
|
| Secondary Glycol 20-95 26 Submittal | 2026 | 03/03/2026 | Glycol | Submittal |
|
| Secondary CO2 1-10 26 Submittal | 2026 | 02/26/2026 | CO2 | Submittal |
|
| Secondary CO2 26 Sequence of Operations | 2026 | 02/26/2026 | CO2 | IOM |
|
| Secondary CO2 26 IOM | 2026 | 09/12/2025 | CO2 | IOM |
|
| Secondary Glycol 26 IOM | 2026 | 09/12/2025 | Glycol | IOM |
|
| Heat Reclaim 26 IOM | 2026 | 09/12/2025 | HRU | IOM |
|
| Secondary Glycol 26 Sequence of Operations | 2026 | 09/12/2025 | Glycol | IOM |
|
| HRU 26 Sequence of Operations | 2026 | 09/12/2025 | HRU | IOM |
|
| Secondary CO2 Startup Guide | 2026 | 09/12/2025 | CO2 | IOM |
|
| Secondary Glycol Startup Guide | 2026, 2024, 2025 | 09/12/2025 | Glycol | IOM |
|
| Level Switch Cleaning & Replacement | 2024, 2025, 2026 | 09/12/2025 | CO2 | IOM |
|
| 3 Way MTW Refrigerant Valve | 2024, 2025, 2026, Archive | 09/12/2025 | HRU | Cutsheet |
|
| Air Separator, #RL3F, 3 Flanged | 2024, 2025, 2026 | 09/12/2025 | Glycol | Cutsheet |
|
| Alfa Laval HE IOM | 2024, 2025, 2026 | 09/12/2025 | CO2, Glycol, HRU | Cutsheet |
|
| Pump Series 4280- IOM | 2024, 2025, 2026 | 09/12/2025 | Glycol | Cutsheet |
|
| Pump Series 4280- Service Work Instructions | 2024, 2025, 2026 | 09/12/2025 | Glycol | Cutsheet |
|
| Armstrong Triple Duty FTV IOM | 2024, 2025, 2026 | 09/12/2025 | Glycol | Cutsheet |
|
| AutoFlow EOL Bypass Valve Manual Balancing | 2024 | 11/15/2025 | Glycol | Cutsheet |
|
| AutoFlow EOL Bypass Valve | 2025, 2026 | 09/12/2025 | Glycol, HRU | Cutsheet |
|
| 3-Way Control Valve Actuator ARQX24-MFT N4, Belimo | 2025, 2026 | 09/12/2025 | HRU | Cutsheet |
|
| CAREL C.PCO Mini & Small Manual | 2024, 2025, 2026 | 09/12/2025 | CO2, Glycol, HRU | Cutsheet |
|
| Drier Shell ; CASTEL #4411E9AF | 2024, 2025, 2026 | 09/12/2025 | CO2 | Cutsheet |
|
| Charging Line Drier ; CASTEL #4411E5AF | 2024, 2025, 2026 | 09/12/2025 | CO2 | Cutsheet |
|
| Check Valve, 3145EW9 | 2024, 2025, 2026 | 09/12/2025 | CO2 | Cutsheet |
|
| COPELAND CONDENSING UNIT, M6GP-H074-CAV | 2024, 2025, 2026 | 09/12/2025 | CO2 | Cutsheet |
|
| CTRL, LOW, P100AC-1AC | 2024, 2025, 2026 | 09/12/2025 | Glycol | Cutsheet |
|
| Drier Core; CASTEL #4490AB | 2024, 2025, 2026 | 09/12/2025 | CO2 | Cutsheet |
|
| EBVT | 2024, 2025, 2026 | 09/12/2025 | CO2 | Cutsheet |
|
| EEV Cables E2VCABS600 | 2024, 2025, 2026 | 09/12/2025 | CO2, Glycol | Cutsheet |
|
| EEV EVD Driver | 2024, 2025, 2026 | 09/12/2025 | Glycol | Cutsheet |
|
| EEV EVD Driver Display | 2024, 2025, 2026 | 09/12/2025 | CO2, Glycol | Cutsheet |
|
| EVD EVO Twin Driver | 2024, 2025, 2026 | 09/12/2025 | CO2 | Cutsheet |
|
| Expansion Tank, NTA60 (C10300-276) | 2024, 2025, 2026 | 09/12/2025 | Glycol | Cutsheet |
|
| Fuse, CC, Spec Sheet | 2024, 2025, 2026 | 09/12/2025 | CO2, Glycol, HRU | Cutsheet |
|
| Fuse, RK5, Spec Sheet | 2024, 2025, 2026 | 09/12/2025 | Glycol | Cutsheet |
|
| Glycol Feeder Tank | 2024, 2025 | 09/12/2025 | Glycol | Cutsheet |
|
| Glycol Feeder Tank IOM | 2024, 2025 | 09/12/2025 | Glycol | Cutsheet |
|
| AutoFlow EOL Bypass Valve 2530 IOM | 2025, 2026 | 02/05/2025 | Glycol, HRU | Cutsheet |
|
| AutoFlow EOL Bypass Valve Manual Balancing IOM | 2024 | 02/05/2025 | Glycol | Cutsheet |
|
| IB-G Valve Controller | 2024, 2025, 2026 | 09/12/2025 | HRU | Cutsheet |
|
| Level Switch, INT276 ICN | 2024, 2025 | 09/12/2025 | CO2 | Cutsheet |
|
| Level Switch, INT276 CN+ | 2026 | 09/12/2025 | CO2 | Cutsheet |
|
| LLS's ME6, ME14, ME25 | 2024, 2025, 2026 | 09/12/2025 | CO2, Glycol | Cutsheet |
|
| Pressure Gauge | 2024, 2025, 2026 | 09/12/2025 | CO2 | Cutsheet |
|
| Pressure Relief Valve RVW17 | 2024, 2025, 2026 | 09/12/2025 | Glycol | Cutsheet |
|
| Pressure Switch CKB | 2024, 2025, 2026 | 09/12/2025 | CO2 | Cutsheet |
|
| Pressure Transducer Valve 35162 | 2024, 2025, 2026 | 09/12/2025 | CO2, Glycol, HRU | Cutsheet |
|
| Pressure Transducer SPKT00G1C0 | 2024, 2025, 2026 | 09/12/2025 | CO2 | Cutsheet |
|
| Pressure Transducer SPKT0011S0 | 2024, 2025, 2026 | 09/12/2025 | Glycol, HRU | Cutsheet |
|
| Pressure Transducer SPKT0013P0 | 2024, 2025, 2026 | 09/12/2025 | CO2, Glycol | Cutsheet |
|
| PRV Changeover Valve 3032E44 | 2024, 2025, 2026 | 09/12/2025 | CO2 | Cutsheet |
|
| PRV, CASTEL 30614C | 2024, 2025, 2026 | 09/12/2025 | CO2 | Cutsheet |
|
| Pump, 4280-1.5X1X6-2P, 5HP, 208, 20-95 | 2024, 2025, 2026 | 09/12/2025 | Glycol | Cutsheet |
|
| Pump, 4280-1.5X1X6-2P, 5HP, 460, 20-95 | 2024, 2025, 2026 | 09/12/2025 | Glycol | Cutsheet |
|
| Pump, 4280-1.5X1X6-2P, 7.5HP, 208, 32-160 | 2024, 2025, 2026 | 09/12/2025 | Glycol | Cutsheet |
|
| Pump, 4280-1.5X1X6-2P, 7.5HP, 460, 32-160 | 2024, 2025, 2026 | 09/12/2025 | Glycol | Cutsheet |
|
| Pump, 4360-1.25-2P, 2HP, HRU | 2025, 2026 | 09/12/2025 | HRU | Cutsheet |
|
| PUMP, HP41P, 2.25 X 1.75 ROTALOK, 3HP | 2024, 2025, 2026 | 09/12/2025 | CO2 | Cutsheet |
|
| Panel Heater, Hoffman | 2024, 2025, 2026 | 09/12/2025 | CO2, Glycol | Cutsheet |
|
| Panel Heater, Hoffman | 2024, 2025, 2026 | 09/12/2025 | HRU | Cutsheet |
|
| Air Vent | 2024, 2025, 2026 | 09/12/2025 | Glycol | Cutsheet |
|
| SLHE_Technical_Exchange_Brochure | 2024, 2025, 2026 | 09/12/2025 | CO2, Glycol | Cutsheet |
|
| Suction Guide, SG-2515, 2.5X1.5 | 2024, 2025, 2026 | 09/12/2025 | Glycol | Cutsheet |
|
| Suction Guide_IOM | 2024, 2025, 2026 | 09/12/2025 | Glycol | Cutsheet |
|
| Temperature Sensor, 40' Lead | 2024, 2025, 2026 | 09/12/2025 | CO2, Glycol | Cutsheet |
|
| CO2 Bypass Valve | 2025, 2026 | 09/12/2025 | CO2 | Cutsheet |
|
| Valve, Triple Duty 3, FTV3FS | 2025, 2026 | 09/12/2025 | Glycol | Cutsheet |
|
| VFD, ACH580-01-04A8-4 | 2024, 2025, 2026 | 09/12/2025 | CO2 | Cutsheet |
|
| VFD, ACH580-01-10A6-2 | 2024, 2025, 2026 | 09/12/2025 | CO2 | Cutsheet |
|
| VFD, ACH580-01-012A-4 | 2024, 2025, 2026 | 09/12/2025 | Glycol | Cutsheet |
|
| VFD, ACH580-01-017A-2 | 2024, 2025, 2026 | 09/12/2025 | Glycol | Cutsheet |
|
| VFD, ACH580-01-024A-2 | 2024, 2025, 2026 | 09/12/2025 | Glycol | Cutsheet |
|
| VFD, ACH580-01-07A6-4 | 2024, 2025, 2026 | 09/12/2025 | Glycol | Cutsheet |
|
| Wiring Harness with Plug SPKC00A310 | 2024, 2025, 2026 | 09/12/2025 | Glycol | Cutsheet |
|
| Y-Strainer, 3, Flanged | 2024, 2025, 2026 | 09/12/2025 | Glycol | Cutsheet |
|
| Emerson EXD-SH1-2 | 2024 | 11/15/2024 | CO2, Glycol | Cutsheet |
|
| Emerson_EX5-I21_Intructions | 2024 | 11/15/2024 | CO2, Glycol | Cutsheet |
|
| Emerson_EX5-I21_Technical Information | 2024 | 11/15/2024 | CO2, Glycol | Cutsheet |
|
| Emerson EXD SH2 Controller | 2024 | 11/15/2024 | CO2, Glycol | Cutsheet |
|
| Emerson_EX6-I21_Intructions (1) | 2024 | 11/15/2024 | CO2, Glycol | Cutsheet |
|
| Emerson_EX6-I21_Technical Information | 2024 | 11/15/2024 | CO2, Glycol | Cutsheet |
|
| CTRL,LOW,P70 | 2024, 2025 | 11/15/2024 | Glycol | Cutsheet |
|
| Heat Reclaim 26 Submittal | 2026 | 04/17/2026 | HRU | Submittal |
|
| HRU Startup Request Form | 2025, 2026 | 10/03/2025 | HRU | IOM |
|
| 2025 Fall Training Powerpoint with Updates | 2025 | 10/31/2025 | Glycol, CO2, HRU, PWRcell 1, PWRcell 2 | Training |
|
| Secondary CO2 26 Spare Parts List | 2026 | 11/14/2025 | CO2 | IOM |
|
| Generac Spare Parts List | 2025, 2026, 2024 | 11/14/2025 | PWRcell 2, PWRcell 1 | IOM |
|
| Secondary Glycol 26 20-95 Spare Parts List | 2026 | 11/14/2025 | Glycol | IOM |
|
| Secondary Glycol 26 32-160 Spare Parts List | 2026 | 11/14/2025 | Glycol | IOM |
|
| Common FAQ's | 2024, 2025, 2026 | 12/01/2025 | CO2, Glycol, Boss | IOM |
|
| Secondary Glycol 25/26 Parameters List | 2025, 2026 | 03/03/2026 | Glycol | IOM |
|
| Secondary CO2 25/26 Parameters List | 2025, 2026 | 03/03/2026 | CO2 | IOM |
|
| Carel to Rack Controller Communication Steps | 2024, 2025, 2026 | 01/07/2026 | CO2, Glycol, HRU | IOM |
|
| Heat Reclaim 26 Spare Parts List | 2026 | 01/07/2026 | HRU | IOM |
|
| Generac PWRcell 2 IOM | 2026 | 01/14/2026 | PWRcell 2 | IOM |
|
| How to Identify Model Year by Serial Number | 2025, 2026, 2024, Archive | 03/03/2026 | CO2, Glycol | IOM |
|
| SIB26-02-GLY | 2026 | 03/03/2026 | Glycol | SB |
|
| Scot Pump 702-6.50-2.0X1.5 7.5HP | 2024, 2025, 2026 | 03/03/2026 | Glycol | Cutsheet |
|
| HRU Startup and Commissioning Check Sheet | 2024, 2025, 2026 | 03/03/2026 | HRU | IOM |
|
| EEV Valve, E3V | 2024, 2025, 2026 | 04/17/2026 | Glycol | Cutsheet |
|
| EEV Valve, E2V | 2025, 2026, 2024 | 04/17/2026 | CO2 | Cutsheet |
|
| Generac Battery/Inverter Install Video | 2024, 2025 | 10/03/2024 | CO2, Glycol | Training |
|
| Training Video | 2024, 2025 | 10/03/2024 | CO2, Glycol | Training |
|
| Liquid Pressure Amplification Overview | 2024, 2025 | 11/15/2024 | CO2, Glycol | Training |
|
| Carel Controller Overview | 2024, 2025 | 11/15/2024 | CO2, Glycol | Training |
|
| Pump Operation Overview | 2024, 2025 | 11/15/2024 | CO2, Glycol | Training |
|
| Heat Reclaim Technology Introduction | 2024, 2025 | 11/15/2024 | CO2, Glycol | Training |
|